Looking at November surgery...anyone else in the long lead up?
-
Trending Products
-
Trending Topics
-
- 116 replies
- 4,320 views
-
- 525 replies
- 24,461 views
-
- 9,404 replies
- 775,517 views
-
Does your pre-op diet weight loss "count"?
By NickelChip, in General Weight Loss Surgery Discussions
- 29 replies
- 1,780 views
-
-
Recent Status Updates
-
I have no clue where to upload this, so I'll put it here. This is pre-op vs the morning of my 6 month appointment! In office I weight 232, that's 88 lbs down since my highest weight, 75 lbs since my surgery weight! I can't believe this jacket fit... I am smaller now than the last time I was this size which the surgeon found really amusing. He's happy with where I am in my weight loss and estimates I'll be around 200 lbs by my 1 year anniversary! My lowest weight as an adult is 195, so that's pretty damn exciting to think I'll be near that at a year. Everything from there will be unknown territory!!· 3 replies
-
-
-
So proud of you Cat. Getting into those smaller size clothes is half the fun isn't it?. Keep up the good work!!!!
-
-
I changed my profile image to a molecule of protein. Why? Because I am certain that it saved my life.· 1 reply
-
That's brilliant! You've done amazing!! I should probably think about changing my profile picture at some point. Mine is the doll from Squid Games. Ironically the whole premise of the show is about dodging death. We've both done that...
-
-
April Surgery· 0 replies
Am I the only struggling to get weight down. I started with weight of 297 and now im 280 but seem to not lose more weight. My nutrtionist told me not to worry about the pounds because I might still be losing inches. However, I do not really see much of a difference is this happen to any of you, if so any tips?
Thanks
- This update has no replies.
-
Well recovering from gallbladder removal was a lot like recovering from the modified duodenal switch surgery, twice in 4 months yay 🥳😭. I'm having to battle cravings for everything i shouldn't have, on top of trying to figure out what happens after i eat something. Sigh, let me fast forward a couple of months when everyday isn't a constant battle and i can function like a normal person again! 😞· 1 reply
-
I may have to have gall bladder surgery during my weight loss surgery. Not thrilled about it either but do not want 2 recovery times. Just want it over with.
Thanks for your post. I may need to rethink my decision...
-
-