Jump to content
×
Are you looking for the BariatricPal Store? Go now!

Starting day 3 post op - am I behind schedule?



Recommended Posts

Hello all,

I just underwent surgery Monday, 6/10/13. Tuesday felt pretty good up until around 4pm when I felt very crappy! Wasn't sure if it was pain or nausea. Lasted for quite a while. I think it was the air/gas that they fill you with for surgery trying to find an escape route! Not pleasant!

Anyway, yesterday was my first full day home. Not sure the plan you were all advised to follow, but I am supposed to be getting in up to 64 oz Water and 50-60g Protein. Yesterday only make it to about 25g Protein and about 10 oz Water.< /p>

Woke up in the middle of the night with a pretty good headache. I'm assuming that is because I'm probably a bit dehydrated.Going to try my best to get as much water and protein in me today as I can.

Was this normal for all of you that are beyond this stage, or in this stage with me?

Thanks in advance for any help/advice!

Share this post


Link to post
Share on other sites

At 3 days post op, I probably got a little more Water and a little less Protein than you list but close. I'm 13 days post op and I'm still struggling to get all my protein and water but it gets a little better each day. You are doing great and know that each day, you will feel just a bit better and be able to do a little more!!! :)

Share this post


Link to post
Share on other sites

Hi Sue:

Congratulations on your surgery. It is normal for you not to get it all in the first few weeks or so. You are swollen and recovering But.. You have to try really hard with your liquids. You don't want to get dehydrated, which you know. I found in the first week warm liquids went down easier, so I had more herbal tea/unjury chicken Soup than plain Water. To this day, I can drink Vitamin Water Zero easier than plain water. Find what works best for you. Good luck!

Share this post


Link to post
Share on other sites

Yesterday I felt awful too. I drank all of my fluids and got all of my Protein in. I did not get all of my calories in, but I am working on that today. I am able to count my protein as fluids and protein, so that is helping me a lot. I felt like I was sipping all the time yesterday. Just keep trying and you will get it in. I was banded 6/10/13 too.

Share this post


Link to post
Share on other sites

Thank you all for your support. Water and pills are going down a bit easier today. Things are coming along!

Share this post


Link to post
Share on other sites

Hi Sue, Jerseygirl is right on. Liquids the first week is priority #1. However you can get it in. You also might try no sugar added popsicles. During my first few days I was able to get down just slightly warm liquids the best. Unjury broth is great, or even chicken bullion in warm Water. Sip, sip, sip....that's your main job, plus a little walking. Congratulations on your choice of a new and healthier life.,,,you'll do just fine. Sherri

Share this post


Link to post
Share on other sites

Thank you all for your support. Water and pills are going down a bit easier today. Things are coming along!

good to hear! right now, make SURE you put liquids ahead of Protein. Your body can handle a week or two without the Protein, but not enough fluids will land you back in the ER faster than you think. I'm sure it's not a place you want to end back up! My first day home post op I got in 30 oz and the 2nd day I got in 40, by day 3 I was able to hit my 64 oz goal. It took me until almost 4 weeks post op to be able to get in about 70 oz a day.

Share this post


Link to post
Share on other sites

Anyway, yesterday was my first full day home. Not sure the plan you were all advised to follow, but I am supposed to be getting in up to 64 oz Water and 50-60g Protein. Yesterday only make it to about 25g Protein and about 10 oz Water.< /p>

Was this normal for all of you that are beyond this stage, or in this stage with me?

You are doing better than I do some days and I will be month out tomorrow. My NUT said to worry about fluids first, protein second for the first week or two because you can live off your fuel storage, but you can't live without fluids. Hydrate!!!

Share this post


Link to post
Share on other sites

Thank you all so much for your input. It really helps to know that I'm not that far off base! Water is definitely going down a lot easier today.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Trending Products

  • Trending Topics

  • Recent Status Updates

    • vsg.with.sharon

      Hey everyone!
      I’m new here! Looking for some friends! 🥰
      · 0 replies
      1. This update has no replies.
    • LeighaTR

      Four days post surgery. I am sipping as fast as I can and getting NO WHERE near the goal of 60 - 80 grams of protein or the 64 oz of liquids. I just feel FULL. I don't know if it can still be the gas build up (I would think by now that would be gone) but it is a struggle to drink. And so far I have not had the nausea or spasms and don't want to wander into that territory by pushing too hard with liquids. I about passed out today as it was my most "strenuous" day. Went from second story to basement for shower and I was sure I was going to pass out. Looking back on my last few days I have had a total of less than 1000 calories. Am I just not getting enough nourishment in me? Once again a friday where I can't get ahold of the doc until Monday rolls back around so I am hoping maybe someone here has some experience on how to keep energy going. I do have fibromyalgia too and that may be where some added fatigue comes into play. How did you all fair with the goals the week after surgery?
      · 0 replies
      1. This update has no replies.
    • Doughgurl

      2 days until I fly out to San Diego to have my Bypass Surg. in Tiajuana Mexico. Not gonna lie, the nerves are starting to surface. I don't fear the surgery itself, or the fact that I'm traveling alone, but its the aftermath that I'm stressing about the most, after this 8 week wait. I'm excited to finally be here, but I am really dreading the post surgical chapter. I know its going to be tough, real tough and I think I'm just in my head to much now that the day i here. Wish me luck, Hopefully I'm one of the lucky ones, and everything goes smoothly. Cant wait to give an exciting update,. If there is anyone else have a June bypass or even a recent one, Id love to have someone to compare war stories with. Also, anyone near San Antonio Tx? See ya soon with the future me. 💜
      · 3 replies
      1. Phil Penn

        Good Luck this procedure is well worth it I am down to 249.6 lb please continue with the process..

      2. Selina333

        I'm in Houston so kind of near you and had the sleeve in Dec. Down 61 lbs. Feeling better. Was definitely worth it. I hope the everything is going well for you. Update us when you can!

      3. Doughgurl

        I am back home after my bypass surgery in Tiajuana. I'm post op day 4. Everything went great! I guess I'm one of the lucky ones who have not encountered much pain at all, no nausea thus far and I'm having no problem keeping down broths and water. Thank you for your well wishes. I cant wait to keep up this journey and have a chance at better health and simply better quality of life. I know there will be bumps in the road ahead, and everything won't be peaches and cream, but at least I have a great start so far. 😍

    • LeighaTR

      I am new here today... and only two weeks out from my sleeve surgery on the 23rd. I am amazed I have kept my calories down to 467 today so far... that leaves me almost 750 left for dinner and maybe a snack. This is going to be tough for two weeks... but I have to believe I can do it!
      · 0 replies
      1. This update has no replies.
    • Doughgurl

      Hey everyone. I'm new here so I thought I should introduce myself. I am 53y/o and am scheduled for Gastric Bypass on June 25th, 2025. I'm located in San Antonio, Texas. I will be having my surgery in Tiajuana Mexico. I've wanted this for years, but I always had insurance where bariatric procedures were excluded. Finally I am able to afford to pay out of pocket.  I can't wait to get started, and I hope I'm prepared for the initial period of "hell". I know what I have signed up for, but I'm sure the good to come will out way the temporary period of discomfort and feelings of regret. I'd love to find people to talk to who have been through the same procedure or experience before. So I look forward to meeting you all. Hope you have a great week!
      · 2 replies
      1. Selina333

        I'm so happy for you! You are about to change your life. I was so glad to get the sleeve done in Dec. I didn't have feelings of regret overall. And I'm down almost 60 lbs. I do feel a little sad at restaurants. I can barely eat half a kid's meal. I get adults meals often because kid ones don't have the same offerings at times. Then I feel obligated to eat on that until it's gone and that can be days. So the restaurant thing isn't great for me. All the rest is fine by me! I love feeling full with very little. I do wish I could drink when eating. And will sip at the end. Just a strong habit to stop. But I'm working on it! You will do fine! Just keep focused on your desire to be different. Not better or worse. But different. I am happy both ways but my low back doesn't like me that heavy. So I listened (also my feet!). LOL! Update us on your journey! I'm not far from you. I'm in Houston. Good luck and I hope it all goes smoothly! Would love to see pics of the town you go to for this. I've never been there. Neat you will be traveling for this! Enjoy the journey. Take it one day at a time. Sometimes a few hours at a time. Follow all recommendations as best you can. 💗

      2. Doughgurl

        Thank you so much for your well wishes. I am hoping that everything goes easy for me as well. We don't eat out much as it is, so it wont be too bad in that department. Thankfully. Also, I hear you regarding your back and feet!! I'd like to add knees to the list. Killing me as we speak! I'm only 5' so the weight has to go. Too short to carry all this weight. Menopause really did a doosey on me. (😶lol) My daughter also lives in Houston. with her Husband and my 5 grand-littles. I grew up in Beaumont, so I know Houston well, I will be sure to keep in touch and update you on my journey. I may need some advice in the future, or just motivation. Thank You so much for reaching out, I was hoping to connect with someone in the community. I really appreciate it. 💜

  • Recent Topics

  • Hot Products

  • Sign Up For
    Our Newsletter

    Follow us for the latest news
    and special product offers!
  • Together, we have lost...
      lbs

    PatchAid Vitamin Patches

    ×