Jump to content
×
Are you looking for the BariatricPal Store? Go now!

Starting day 3 post op - am I behind schedule?



Recommended Posts

Hello all,

I just underwent surgery Monday, 6/10/13. Tuesday felt pretty good up until around 4pm when I felt very crappy! Wasn't sure if it was pain or nausea. Lasted for quite a while. I think it was the air/gas that they fill you with for surgery trying to find an escape route! Not pleasant!

Anyway, yesterday was my first full day home. Not sure the plan you were all advised to follow, but I am supposed to be getting in up to 64 oz Water and 50-60g Protein. Yesterday only make it to about 25g Protein and about 10 oz Water.< /p>

Woke up in the middle of the night with a pretty good headache. I'm assuming that is because I'm probably a bit dehydrated.Going to try my best to get as much water and protein in me today as I can.

Was this normal for all of you that are beyond this stage, or in this stage with me?

Thanks in advance for any help/advice!

Share this post


Link to post
Share on other sites

At 3 days post op, I probably got a little more Water and a little less Protein than you list but close. I'm 13 days post op and I'm still struggling to get all my protein and water but it gets a little better each day. You are doing great and know that each day, you will feel just a bit better and be able to do a little more!!! :)

Share this post


Link to post
Share on other sites

Hi Sue:

Congratulations on your surgery. It is normal for you not to get it all in the first few weeks or so. You are swollen and recovering But.. You have to try really hard with your liquids. You don't want to get dehydrated, which you know. I found in the first week warm liquids went down easier, so I had more herbal tea/unjury chicken Soup than plain Water. To this day, I can drink Vitamin Water Zero easier than plain water. Find what works best for you. Good luck!

Share this post


Link to post
Share on other sites

Yesterday I felt awful too. I drank all of my fluids and got all of my Protein in. I did not get all of my calories in, but I am working on that today. I am able to count my protein as fluids and protein, so that is helping me a lot. I felt like I was sipping all the time yesterday. Just keep trying and you will get it in. I was banded 6/10/13 too.

Share this post


Link to post
Share on other sites

Thank you all for your support. Water and pills are going down a bit easier today. Things are coming along!

Share this post


Link to post
Share on other sites

Hi Sue, Jerseygirl is right on. Liquids the first week is priority #1. However you can get it in. You also might try no sugar added popsicles. During my first few days I was able to get down just slightly warm liquids the best. Unjury broth is great, or even chicken bullion in warm Water. Sip, sip, sip....that's your main job, plus a little walking. Congratulations on your choice of a new and healthier life.,,,you'll do just fine. Sherri

Share this post


Link to post
Share on other sites

Thank you all for your support. Water and pills are going down a bit easier today. Things are coming along!

good to hear! right now, make SURE you put liquids ahead of Protein. Your body can handle a week or two without the Protein, but not enough fluids will land you back in the ER faster than you think. I'm sure it's not a place you want to end back up! My first day home post op I got in 30 oz and the 2nd day I got in 40, by day 3 I was able to hit my 64 oz goal. It took me until almost 4 weeks post op to be able to get in about 70 oz a day.

Share this post


Link to post
Share on other sites

Anyway, yesterday was my first full day home. Not sure the plan you were all advised to follow, but I am supposed to be getting in up to 64 oz Water and 50-60g Protein. Yesterday only make it to about 25g Protein and about 10 oz Water.< /p>

Was this normal for all of you that are beyond this stage, or in this stage with me?

You are doing better than I do some days and I will be month out tomorrow. My NUT said to worry about fluids first, protein second for the first week or two because you can live off your fuel storage, but you can't live without fluids. Hydrate!!!

Share this post


Link to post
Share on other sites

Thank you all so much for your input. It really helps to know that I'm not that far off base! Water is definitely going down a lot easier today.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Trending Products

  • Trending Topics

  • Recent Status Updates

    • CaseyP1011

      Officially here for a long time, not just a good time💪
      · 0 replies
      1. This update has no replies.
    • KimBaxleyWilson

      Three months and four days ago... I was in Costa Rica having a life changing surgery! Yesterday we had a followup visit with Dr. Esmeral via video chat and this morning my middle number changed.  I'm down 47lbs and two pants sizes. I can wear a Large tshirt for the first time in like... 14 years! Woot!! Everything is going great. I have zero regrets. I went down to the riverwalk with a friend and walked 2 miles on Monday without even getting fatigued. And no more snoring or chugging pickle juice for crazy leg cramps! I need to go to the gym more... I'm making new shirts next week so that will motivate me. LOL But I'm also just not as TIRED all the time! I have a LONG way to go...but seeing the progress on the scales and in the mirror is a huge motivator!! Thank you all for cheering me on and supporting me!!
      · 0 replies
      1. This update has no replies.
    • bellaamey

      https://alluniqueguide.com/java-burn-coffee-reviews/
      · 0 replies
      1. This update has no replies.
    • rlcpd

      Two months out from hiatal hernia repair.  Surgeon said to expect a lot more flatulence...something about the 'air' no longer being able to 'burp' out so comes out the other end.  That is my experience but have no understanding of why that swallowed air cannot be 'burped'. ???
      · 1 reply
      1. BlondePatriotInCDA

        As I understand it since your stomach is smaller and not completely resting against your diaphragm anymore you no longer have the ability to "push" burps out as well. Plus, since its smaller and we don't digest slower the trapped air moves a lot quicker out of the stomach so its no longer available to burp out. Hence the other option for removal.

    • Lizette1122

      Anyone had the TORe procedure? How did it go? How much weight did you loose? 
      · 0 replies
      1. This update has no replies.
  • Recent Topics

  • Hot Products

  • Sign Up For
    Our Newsletter

    Follow us for the latest news
    and special product offers!
  • Together, we have lost...
      lbs

    PatchAid Vitamin Patches

    ×